Re: What was done to YOUR rig today?
My uncle and I continued the project of switching center consoles and shifters. (Don't have write-up on e-brake customization) but shifter switch base brackets bolt write up, however the lower interlock linkage had to be switched. They fit though.
Yanked the seats, center console, kicker panels, carpet and removed the fiberglass insulation garbage due to water leak(s) in the weatherstripping somewhere around the doors (21 year-old XJ, figures), cuz the entire floorboard was soaked. Not too much rust. No holes.
Installing "peel and seal" aka cheap, yet just-as-efficient as dynamat from Home Depot in the entire cab tomorrow.
Removed two drainholes.
Vacuumed?
Pretty successful day, I'd say.