stumpXJ
NAXJA Forum User
- Location
- Atlanta, Georgia
Been working like a mad man for the past few weeks getting my garage set-up.
Went from this:
To this. I had to raise the ceiling height to 13 feet so my two post lift will fit in it. I also added 100 amp electrical service to the garage for my machines (lift, welder, small mill, small lathe, etc etc.)
Insulated, sheetrocked and ready for paint!
painting sucks... especially a 13 foot ceiling.
I also got all my electrical put in on Friday, my final inspections are tuesday and wednesday.
Soooo glad to have my stuff here now! Tools...
Today I just finished putting down the epoxy flooring. I will get a couple pics up later.
Here is the full build link to my garage. http://garagejournal.com/forum/showthread.php?t=36703
~James
Went from this:


To this. I had to raise the ceiling height to 13 feet so my two post lift will fit in it. I also added 100 amp electrical service to the garage for my machines (lift, welder, small mill, small lathe, etc etc.)

Insulated, sheetrocked and ready for paint!

painting sucks... especially a 13 foot ceiling.

I also got all my electrical put in on Friday, my final inspections are tuesday and wednesday.


Soooo glad to have my stuff here now! Tools...

Today I just finished putting down the epoxy flooring. I will get a couple pics up later.
Here is the full build link to my garage. http://garagejournal.com/forum/showthread.php?t=36703
~James