so were building a red robin in the palisades mall, and I have to go pick up the material tomorrow.
[FONT=Calibri,sans-serif]6'' Metal Track 10' 18 GA. PCS 25.0000[/FONT]
[FONT=Calibri,sans-serif]6'' Metal Stud 30' 18 GA. PCS 90.0000[/FONT]
[FONT=Calibri,sans-serif]6'' Metal Track 3'' Deep Leg 10' 18 GA. PCS 15.0000[/FONT]
[FONT=Calibri,sans-serif]6'' Metal Track 10' 20 GA PCS 30.0000[/FONT]
[FONT=Calibri,sans-serif]6'' Metal Stud 16' 20 GA PCS 50.0000[/FONT]
[FONT=Calibri,sans-serif]6'' Metal Stud 10' - 20 GA PCS 30.0000[/FONT]
[FONT=Calibri,sans-serif]6'' Metal Track 10' 16 GA. PCS 6.0000[/FONT]
[FONT=Calibri,sans-serif]3-5/8'' Metal Stud 30' 20 GA PCS 90.0000[/FONT]
[FONT=Calibri,sans-serif]3-5/8'' Metal Track 10' 20 GA PCS 30.0000[/FONT]
[FONT=Calibri,sans-serif]3-5/8'' Metal Track - 3'' Deep Leg 10' 20 GA. PCS 10.0000[/FONT]
[FONT=Calibri,sans-serif]3-5/8'' Metal Stud 10' 20 GA PCS 20.0000[/FONT]
[FONT=Calibri,sans-serif]3-5/8'' Metal Stud 12' 20 GA PCS 10.0000[/FONT]
[FONT=Calibri,sans-serif]3-5/8'' Metal Stud 16' 20 GA PCS 5.0000[/FONT]
[FONT=Calibri,sans-serif]I dont know how were going 30' studsinto the mall.[/FONT]