radardog
NAXJA Forum User
- Location
- redding, ca
ok so this is a question for you guys who have done the following:
plated "frame" rails with 3x3x1/4 angle
installed rocker-steps using 2x6x1/4
built/extended radius arms
installed radius arm set up in your XJ
now what i need is a rough estimate for how long it takes to do this work.
i have access to a full metal shop, with welders beders chop saws... the works. as my boss is really cool. however i cant be tying up his shop for a month or anything crazy. so i just wanted to give him a general idea for how long one of his bays was to be filled up.
i have done tons of reading on the above topics, just no one really says how long it takes.
thanks in advance for your replies
plated "frame" rails with 3x3x1/4 angle
installed rocker-steps using 2x6x1/4
built/extended radius arms
installed radius arm set up in your XJ
now what i need is a rough estimate for how long it takes to do this work.
i have access to a full metal shop, with welders beders chop saws... the works. as my boss is really cool. however i cant be tying up his shop for a month or anything crazy. so i just wanted to give him a general idea for how long one of his bays was to be filled up.
i have done tons of reading on the above topics, just no one really says how long it takes.
thanks in advance for your replies