got my tubing today, so i'll be working on the axle over the next few weeks.
i'm ordered the stator kit i needed for my locker, and i also am ordering chromo rubicon inners, new gears, and all new bearings and seals. i'm excited to tear into this, should be pretty fun. i really hope i can get this done soon as i got some new rubber waiting to go on, but since the bolt pattern is different, i can't use them now. luckily my rear axle has dual bolt patterns in the shafts so all i'll have to do is drill out the exploder rotors. that's only 5 minutes of programing and maybe 10 minutes of cutting on the mill.
i also have a plan for machining out the inner c's. i'm going to cut the tubes and leave enough to hold onto in the lathe, and just bore it out. i'll bore it up to the edge of the weld, leaving the c attached to the tube until i bore it to the proper diameter. then i'll cut the weld off later. the plan is to indicate the inside of the tube and get it running true in the lathe, and bore a tiny step about .01-.02" larger than the finished diameter so i can indicate it back in for the finish cut after i rough it all out.