Sig Ep Mock
NAXJA Forum User
- Location
- Rancho Cucamonga
Still on the to do list
1) Tab for and install roof.
2) Seat belts.
3) Build rear tail gate.
4) Install rear tire mount, Highlift mount, tool box mount, etc....
5) Install rear LED light box and lights.
6) Wire everything
7) Rhino line interior
8) I know there's more....
Damn does it ever end ????
I'm going to take 4 tylenol's, drink a beer, and jump in the spa party1:
Chris
1) Tab for and install roof.
2) Seat belts.
3) Build rear tail gate.
4) Install rear tire mount, Highlift mount, tool box mount, etc....
5) Install rear LED light box and lights.
6) Wire everything
7) Rhino line interior
8) I know there's more....
Damn does it ever end ????

I'm going to take 4 tylenol's, drink a beer, and jump in the spa party1:
Chris