- remove supercharger, get engine back to stock
DONE
- remove front shafts, rebuild for spares
- remove rear shafts for spares
- remove driveshafts, to check joints and measure for spares
DONE
- order and install new alloy shafts front & rear
Fronts are installed, rears are ordered
- build spare driveshafts
- swap 35" street tires out for 37" iRocks
DONE
- rebuild traction bar
- might rebuild tracbar
- tighten & grease ballistic joints
- get new CB antenna
- fix fog & rock lights
- change valve cover gaskets
DONE
- change oil
DONE
- change front & rear diff fluid
- top off trans & tcase
- a few other things I'm sure...
Oh, and fill out my Crawl registration
DONE
Add to my list...
- fix bent rear axle housing
- build truss for rear axle
- swap out all 4 calipers for better brakes