- Location
- Southwest IN
To Do:
1. Finish TNT LAs.
2. Install TNT trackbar.
3. Install front Aussie locker.
4. Fill CO2 tank.
5. Install SOLID diff cover on the 8.8.
Want to do:
Convince Pat to whip up another roof slider for me
1. Finish TNT LAs.
2. Install TNT trackbar.
3. Install front Aussie locker.
4. Fill CO2 tank.
5. Install SOLID diff cover on the 8.8.
Want to do:
Convince Pat to whip up another roof slider for me
