got alot of work done on the cage today. actually worked on it from 1:00-10:30. extremely hot out, hotter in the garage, even hotter welding in the garage...
got the B and C pillars done.
once you drill some 1.5" holes through the rood you know youre comitted to finishing fast, my goal to kick myself in the butt
got the halo etc mostly done. got alot done after the pic. the connecting bars to from the a, b, and c pillars down the middle are done as well, as well as started some traingulation. got alot done after this pic
also, i am using a angle grinder to notch all my tube, and it works great.
i actually prefer it, even though ive never used a notcher, a real notcher seems like a pain in the ass.
ive gotten to the point where the cuts are very clean and round, not always 100% symmetrical, but fit the tube good enough.
i have been doing 2 passes on every weld, one with 3/4 max heat to mock up, then full heat later on to really burn it in. Seems very strong.
i onyl have a 20amp breaker so the welder is constantly tripping the breaker plus the welder overheats alot and has to sit.
up next for tomorrow:
finish halo and triangulation up top(only one more piece for that)
drill out floor plates for b and c pillar to bolt through
B pillar internal cross bar
B pillar legs from below body to frame(bolt through floor to a plate, that is tied into frame with a leg. basically sandwhich)
paint everything up to that point
then weld up the halo the b and c pillars
A pillars(extrenal) (2 bends in each)
once a pillars are done then ill do the cowl cross bar
then paint all that
if i have some tube left i want to start a floor cage, and more internal triangulation, and maybe a external D pillar that ties into the rear bumper but hugs the body real well
and build some flared tube for the front fenders.