• Welcome to the new NAXJA Forum! If your password does not work, please use "Forgot your password?" link on the log-in page. Please feel free to reach out to [email protected] if we can provide any assistance.

NWFest, what needs to be done.

New-ish stuff to do...

Solve overheating issue, replace overflow bottle and possibly radiator.
Change tranny filter/oil
Pay John

~Scott
 
You sure?

051509_7637.jpg


That is a fine looking axle...



I am making good progress

axles - Gearing a lockers should be done this week
Lift kit - In process of installing - friggin work trips are killing me Should have this wrapped up and dialed in this weekend.
tires - see previous.. want them out of the living room..

Then just slap the rock sliders on and I am Good to go.. Hoping for a trial run June 12th.
 
  1. figure out why new radiator hose is leaking
  2. build new track bar
  3. weld new TB mount to axle
  4. fix uca bushing on axle
  5. install front locker
  6. order and install alloy shafts for front
  7. install TJ flares
  8. install xfer case
  9. make xfer case linkage work
  10. switch flange CV to new rear DS
  11. tons of other little crap
 
Install TNT 1ton OTK steering
Install TNT inner and outher steering box braces
Alignment
weld fender gap closed
bump stop front and rear
install KC 130W slim lights
wire power to CB and tune radio
tighten all the bolts and give full once over

looks like ill be making a deposit to ACRO soon
 
I have the DOM (1.5" OD 3/8" wall) I need for the TB and I have the bracket. Just waiting on the rod ends and RE bracket.
 
get Cal Rocs to re-schedule their 3rd event? :wierd:
 
1. Replace rear shocks
2. Replace fuel filter
3. Lube / grease all fittings
4. Remount winch lower in bumper
5. Service rear brakes
6. Straighten steering wheel
 
New front springs Done
Onboard Air Done
Rear bumper/airtank with lines Changed my mind
A way to mount a pony keg in the back and keep it cold I was only joking

Other than that, I'm pretty damn good. This is true


New rear leaf springs ?
Change the LSD in the rear for a Detroit Monday or Tuesday
 
Engine=DONE
Removeable doors=DONE
Rocker replacements=NOT HAPPENING
'Frame stiffners'=NOT HAPPENING
Shackle boxes=SHOOTING FOR THIS WEEKEND
New leaf packs=SAME AS ABOVE
Gas tank, TC, trans skids=TC AND TRANS DONE
Assemble interio=DONE
2 new tires=DONE
Trans and PS coolers=DONE
Rear seat=DONE
Im sure there is more=MOSTLY DONE

I hate working on Jeeps. :D
 
progress made this weekend.

Aussie locker installed.
back bed lined
Ruff stuff cover for rear diff painted

ran into a few snags due to the DD not working half the weekend, but i'm making progress.
 
Back
Top