DRaider90
NAXJA Forum User
- Location
- Charlotte, NC
The first workday of 2013 is currently scheduled for January 26th during the seasonal trail closure. A workload has not been established yet, but typically the Forest Service uses the Off-Season workdays to get as much done as possible. This usually involves an equipment rental to tackle the bigger projects. The tentative schedule goes as follows:
8AM: Breakfast @ Eldorado Outpost, some of us get together in the back of the Outpost and eat breakfast.
9AM: Forest Service Meeting @ Hunt Camp, this is the official meet up time for the workday where everyone signs in and is briefed on the projects for the day.
1PM: Lunch, around 1pm everyone stops to have a trail side lunch.
3PM: Wrap up, there is no scheduled wrap up time but usually work ends sometime around 3pm.
More information on supplies/tools to bring as more information is made available about the actual work load planned.
8AM: Breakfast @ Eldorado Outpost, some of us get together in the back of the Outpost and eat breakfast.
9AM: Forest Service Meeting @ Hunt Camp, this is the official meet up time for the workday where everyone signs in and is briefed on the projects for the day.
1PM: Lunch, around 1pm everyone stops to have a trail side lunch.
3PM: Wrap up, there is no scheduled wrap up time but usually work ends sometime around 3pm.
More information on supplies/tools to bring as more information is made available about the actual work load planned.