• Welcome to the new NAXJA Forum! If your password does not work, please use "Forgot your password?" link on the log-in page. Please feel free to reach out to [email protected] if we can provide any assistance.

4th annual TSF Thanksgiving run

ok guies. IN! got a copilot. should have my bumpers, skids, and dif guard installed by then. also got some work to do to the new travle trailer before then.

damn... now that i think about it i got a TON to do B4 then. Ohhh well still in. should be a fun trip.

BronzeWyrm
heres my to-do list
JCR Front bumper Tie-ins. (make my bumper a real tow point!)
all 4 ball joints
Front diff service
Rear Leaf spring R&R
Rear bumper R&R
Weld Up 5" crack in Downpipe (thanks crushers filter!)
Replace TRE on Trackbar
New glass on KC Hilight
Wire up KC hilights
M&B spare tire
Buy and install Rock rails (maybe)
Install rear Mini-spool
New U-joints in Rear Driveline


Long list, but it was twice as long 2 weeks ago!
 
Heres mine...

FIND RIMS
buy rims
put tires on said rims
tighten up track bar
grease
ignore my jeep shaking like its gonna fall apart on the freeway
WHEEL!
(hope my jeep doesnt leave me stranded and i can get back to portland.)
 
well my list includes, but not limited to.

Wet sand/buff EE-Z doors, tailgate, and fenders. Body work, prime, paint, and detail Tub for EE-Z. Deliver and pickup

Remove stock bumper(s) from the XJ. remove rear u-haul hitch.
Install:
Front winch bumper.
Rear bumper
reinforce, Prep, prime, paint, and install front skid aswell as gas tank skid.
Fix Drivers side rocker, Fabb rocker armor, install rocker armor.
Install Rocksliders.
Front door shims. (still croked from the tube door install)
full tuneup.
Camp gear need gone throo.
Reinstall all matting for the xj.
Title and tag the xj.

now amongst all this. we have a full Airplane, 2 spot jobs (fenders/hood), and another full car to move in and out of the paint shop. on top of all the above listed things. and not including any work i "may" do to the new trailer. "i may just tent camp it like usual."

OH Yeah TURKEY TURKEY TURKEY. then maby..... just maby. Wheel.


:looney: Bronze.



P.S. oh ya and our compressor took a poopie so im doing all my prep/body work by Hand.:hang:
 
well my list includes, but not limited to.

Wet sand/buff EE-Z doors, tailgate, and fenders. Body work, prime, paint, and detail Tub for EE-Z. Deliver and pickup

Remove stock bumper(s) from the XJ. remove rear u-haul hitch.
Install:
Front winch bumper.
Rear bumper
reinforce, Prep, prime, paint, and install front skid aswell as gas tank skid.
Fix Drivers side rocker, Fabb rocker armor, install rocker armor.
Install Rocksliders.
Front door shims. (still croked from the tube door install)
full tuneup.
Camp gear need gone throo.
Reinstall all matting for the xj.
Title and tag the xj.

now amongst all this. we have a full Airplane, 2 spot jobs (fenders/hood), and another full car to move in and out of the paint shop. on top of all the above listed things. and not including any work i "may" do to the new trailer. "i may just tent camp it like usual."

OH Yeah TURKEY TURKEY TURKEY. then maby..... just maby. Wheel.


:looney: Bronze.



P.S. oh ya and our compressor took a poopie so im doing all my prep/body work by Hand.:hang:

Holy sheeet ! what are you doing on the computer ? GET BACK TO WORK ! :twak:
 
heres my to-do list
JCR Front bumper Tie-ins. (make my bumper a real tow point!) might not do
all 4 ball joints ordered
Front diff service
Rear Leaf spring R&R
Rear bumper R&R done
Weld Up 5" crack in Downpipe (thanks crushers filter!) tomorrow
Replace TRE on Trackbar done
New glass on KC Hilight
Wire up KC hilights
M&B spare tire done
Buy and install Rock rails (maybe) nope
Install rear Mini-spool
New U-joints in Rear Driveline


Long list, but it was twice as long 2 weeks ago!

Gettin there. slowly
 
Back
Top