- Fix Idle Issue (
DONE)
- Build rear bumper (
DONE)
- Build track bar brace (
DONE)
- Build steering box brace (
DONE)
- Wash/Vacuum the Jeep (
DONE)
- Finish passenger half door (
DONE)
- Have tires rotated/balanced (
DONE)
- Have CB Tuned (
DONE Thanks FiveNDime)
- Beef up the rear cargo tie-downs (
DONE)
- Change transmission and transfer case fluid (
DONE)
- Check fluids, torque suspension, grease joints, air pressure, etc (
DONE)
- Teralow (Not going to happen)
- Install rear disc brakes (
Not going to happen)
- Figure out how to fit 10lbs of junk in a 5lb bag (She's riding low, but it's all in there.

)