Rubicon work project results

Simple Man

NAXJA Member #979
Location
Nevada
Great weekend to get some work done, beutiful weather.
We(Dysfunctional Rockcrawlers) worked on the base of Walker Hill and extended the log/rock ramp about 40 feet to help withthe erosion problem. It still needs a little work and probably some dead fall on the upper side to keep the motorcycles on the trail.
Big thanks to Pirates Of the Rubicon for all the rock hauling they did and thanks to all the random people who showed up to help when some of us were running out of steam. :cheers:
picture.JPG

picture.JPG

picture.JPG
 
Back
Top