Avanteone
NAXJA Forum User
- Location
- Auburn, WA
Rather than edit/cut/whatever the old 14 page thread on the THOR's, we're just starting a new one and going to lock the old thread. All current pricing, info, etc. will be here. You can reference the old thread here for info:
http://www.naxja.org/forum/showthread.php?t=935774&page=12
Most if the current info starts on page 12
OK, here is the timeline I have been given: FROM the date the order is placed, the laser cutter has given us a 2 to 4 week window. From the time the laser cutter is done, the roller has given us a 4 to 6 week window. Once all the work is done, it will take a few days or so to get them all assembled and welded. SO, this means from the time I place the order, we are looking anywhere from 7 to 11 weeks. Now, it's very possible this will take place quicker, and from what I understand the laser cutter will call when our pieces start so that we can get our place held in line @ the roller, so they could be done in as little as a month or month and a half, but I am NOT going to hold my breath and I am NOT going to promise anything... that is why I am telling you all the worst case scenario.
SO, those of you still interested, email me: [email protected]
Please include full name, contact info, year of XJ, etc. I will call or email back for credit card information. Price is $345 local, $395 shipped. IF you are a WA resident paying /w credit card, be prepared to add 9.0% sales tax.
Thank you for your patience. I plan on keeping this order open for a week, possibly two or until most of the names on my waiting list have responded and the response has died down.
John
253-939-5019
http://www.naxja.org/forum/showthread.php?t=935774&page=12
Most if the current info starts on page 12
OK, here is the timeline I have been given: FROM the date the order is placed, the laser cutter has given us a 2 to 4 week window. From the time the laser cutter is done, the roller has given us a 4 to 6 week window. Once all the work is done, it will take a few days or so to get them all assembled and welded. SO, this means from the time I place the order, we are looking anywhere from 7 to 11 weeks. Now, it's very possible this will take place quicker, and from what I understand the laser cutter will call when our pieces start so that we can get our place held in line @ the roller, so they could be done in as little as a month or month and a half, but I am NOT going to hold my breath and I am NOT going to promise anything... that is why I am telling you all the worst case scenario.
SO, those of you still interested, email me: [email protected]
Please include full name, contact info, year of XJ, etc. I will call or email back for credit card information. Price is $345 local, $395 shipped. IF you are a WA resident paying /w credit card, be prepared to add 9.0% sales tax.
Thank you for your patience. I plan on keeping this order open for a week, possibly two or until most of the names on my waiting list have responded and the response has died down.
John
253-939-5019