...to build a road.
I swear to God these guys are carrying the gravel to site in teaspoons. They've been at it for nearly a year! It's only two lanes and not more than 1.25mi long.
Back at Xmas I figured all they needed to do was lay some curb, pour some sidewalk and finish paving it. They've had the same four guys building sidewalk for the last three months. I kid you not! Four guys with hand tools building sidewalk. They get - maybe one square every two or three days!!! I'm serious! I see them standing around wire-tying rebar together. Two or three days later there's one section of the sidewalk poured and they're standing around tying wire for the next section. Should I seriously think that they are bringing in a truck to pour one section at a time? Across town a section 8 housing development graded, prepped and poured an entire driveway and parking lot in under a week, so I know you can build a sidewalk faster than one section every 2 or 3 days!!! These guys are driving me crazy. I'm afraid that one day I'm going to stop right in the middle of the detour, jump out and show them how to build a frackin' sidewalk. More than likely I couldn't teach them anything...I'm pretty sure I don't speak their language
I'm done.
I swear to God these guys are carrying the gravel to site in teaspoons. They've been at it for nearly a year! It's only two lanes and not more than 1.25mi long.
Back at Xmas I figured all they needed to do was lay some curb, pour some sidewalk and finish paving it. They've had the same four guys building sidewalk for the last three months. I kid you not! Four guys with hand tools building sidewalk. They get - maybe one square every two or three days!!! I'm serious! I see them standing around wire-tying rebar together. Two or three days later there's one section of the sidewalk poured and they're standing around tying wire for the next section. Should I seriously think that they are bringing in a truck to pour one section at a time? Across town a section 8 housing development graded, prepped and poured an entire driveway and parking lot in under a week, so I know you can build a sidewalk faster than one section every 2 or 3 days!!! These guys are driving me crazy. I'm afraid that one day I'm going to stop right in the middle of the detour, jump out and show them how to build a frackin' sidewalk. More than likely I couldn't teach them anything...I'm pretty sure I don't speak their language

I'm done.