Mr.OverKill
NAXJA Forum User
- Location
- the city of El Cajon
take one ome trakc bar, add heat, 1.125id heavy wall tubing, gr8 bolt and nut, a little welding and voila, one adjustable track bar
using a fine thread bolt i am within a 1/8th inch of center and i set the angles so at full droop and max flex there is no binding, i just dont know how well it will work when i build my long arm setup but for now it works killer and i have over 2.5 inches of threaded bolt inside the bar for extention
total cost for parts $2.25 for the nut and bolt from K-surpluss and $1 worth of 11018 welding rod, $5.00 for the electricity ( paid to my wife ) and total time from start of removal to compleation of install, 8.5 hours ( in two segments 7.5 on day 1 and 1 on day 2 paint drying over nite )
what do you think?
using a fine thread bolt i am within a 1/8th inch of center and i set the angles so at full droop and max flex there is no binding, i just dont know how well it will work when i build my long arm setup but for now it works killer and i have over 2.5 inches of threaded bolt inside the bar for extention
total cost for parts $2.25 for the nut and bolt from K-surpluss and $1 worth of 11018 welding rod, $5.00 for the electricity ( paid to my wife ) and total time from start of removal to compleation of install, 8.5 hours ( in two segments 7.5 on day 1 and 1 on day 2 paint drying over nite )
what do you think?