shit, I still gotta do those too. :laugh3: I have 4 days off but will be stuck at a family parties for the majority of that time so while I CAN work on stuff like welding rockers/etc, at the same time I can't because little kids will be running around so I probably shouldn't.
I'll just try to get the steering done and call it a weekend after that and enjoy the party. Would a 110V mig (with pre-heating) be enough to weld a trackbar bracket on the axle or should I really just tack it and have someone burn it in place with 220V tig/stick (or wait until I pick up a 220V stick and do it myself)? I have the tie rod and most of the drag link for my 1-ton steering done, just have to convince myself that I should cut the track bar bracket off to do the OTK steering. Once the Jeep is parked I will probably just hit it with a sawzall to get it to a point where I can't turn back and just HAVE to get it done :laugh: