XJfreakHO
NAXJA Forum User
- Location
- Greensboro NC
FS is (has) taken bids on deconstruction (they use the word "Obliteration") of the OHV trails in Tellico. Looks like from the dates that the bidding period has already happened. Either way it's a really bad sign for any hope of getting the trails back. So even if the lawsuit works, by the time it happens there won't be any damn trails to ride anyway. Just from their chosen verb I get the feeling they really want Tellico gone ASAP.
Google this: FED BIZ OPPS.GOV
You'll find these:
https://www.fbo.gov/index?s=opportun...aefb06b3300338
https://www.fbo.gov/download/18d/18d...-_Drawings.pdf
Information from FunkSkunk on NC4x4
http://www.nc4x4.com/forums/showthread.php?t=88089
link to thread over there
Google this: FED BIZ OPPS.GOV
You'll find these:
https://www.fbo.gov/index?s=opportun...aefb06b3300338
https://www.fbo.gov/download/18d/18d...-_Drawings.pdf
Information from FunkSkunk on NC4x4
http://www.nc4x4.com/forums/showthread.php?t=88089
link to thread over there