Prepare for a bombardment of pictures (and booger welds). I'm also going to jump around a lot.
I've been trying to haul ass in order to make NACfest, and so far so good.
I had the engine on the stand and just wanted to double check my original measurements with downpipe to oil pan clearance. Plenty of room.
Half welded bung from Milodon

. 100% leak tested my ass. I threw some boogers at it and now it's fine.
Clutch fork is from a 70s B/E body Mopar. They use a piece of spring steel instead of a return spring/pivot ball. Actually much nicer, and you can remove/insert the clutch fork without pulling the bellhousing. Throwout bearing is a standard Dodge NV4500 (1.125" 10 spline input shaft).
Gussetted/painted motor mounts.
Fresh paint means rebuilt, right?
Patched the firewall and welded up the pinch seam on the passenger side after my temper tantrum with the floor and the coolant tubes wanting to occupy the same space.
If you notice in the last pic, my front brake line went over the firewall and down the UCA to the front axle. Since I now have some larger exhaust tubing and the coolant tubes over there, I'm thinking of running it down the trackbar, over the ram skid, and splitting it behind the tubes as well. More vulnerable, I guess?
Flywheel on with ARP bolts (cause I'm ghey).