Damn military and significant other have put this on the back burner. I only work on it about once a week and I am going to be leaving monday through april 16th. I have most of the interior stripped, the motor and trans mounted and the headers started. I need to do the radiator, rear diff, driveshaft, weld up the engine bay, de power the steering, and fill the fluids. My dad is going to wire the thing up hopefully for me and deal with the vacuum and fuel lines. then it should move enough to get to Wyoming and hopefully into a house with a garage were I will finish and refine it. This is just a 350 and th350 out of a 77. I have a vortec 5.7 up in Wyoming waiting on me, I also am going to do a rear 8.8 out of a tbird with 3.07s instead of these 4:10s since I am going from a .8 to a 1 final drive in the transmission. I have been looking to cam and throw a 150 shot at it when it is done and moving nicely.
I will post pictures later.