Iron Rock Critical Path Long Arm

The passenger side uses no upper control arm? Why?

it makes for a less rough ride over bumps etc on the street.

not really

To be clear, ride is much improved, especially off-road. Wash boards and large bumps on the fire roads are no longer a problem. KTM Racer explain how improved suspension geometry does not help the ride on lifted vehicles.

the lack of one upper control arm will not make a noticable difference in ride quality. they probably did away with it for the less binding= improved articulation and easier caster adjustments
 
Oh ok, you guys were specifically talking about the lack of the pass CA. The long arm kit in general makes for a smoother ride though. The way I understand it is that the more parallel the CA are to the body, the smoother the ride.
 
Can you post more about the build and photos with it flex out.
 
Do the shocks come with BPE's for the front and rear, or can you just take the bar pin out of your old shocks and use them in the Bilstein's??

BPEs don't come with the kit but your old ones will work on the Bilsteins.
 
Can you post more about the build and photos with it flex out.


Sold it, so sorry no more pics. I told the new owner to join NAXJA. I will contact him and see if he has some pics.
 
Okay but really thanks for the thread build dude!
 
Back
Top