ktm racer 419
NAXJA Forum User
- Location
- ROW DIALIN
The passenger side uses no upper control arm? Why?
it makes for a less rough ride over bumps etc on the street.
not really
To be clear, ride is much improved, especially off-road. Wash boards and large bumps on the fire roads are no longer a problem. KTM Racer explain how improved suspension geometry does not help the ride on lifted vehicles.
the lack of one upper control arm will not make a noticable difference in ride quality. they probably did away with it for the less binding= improved articulation and easier caster adjustments