XJosh95
NAXJA Forum User
- Location
- Green Bay, WI
New season starts in January!Me too.....but I'm just gonna sit on the couch, eat a sammich and watch Archer.
Pretty much what I did with mine but I didn't use the angle iron. Tack welded a pulling bar to the pinch seam and pulled the remaining sheet metal up to the 2x6.So far we have about 8 inches ish up here. This morning on the way to work there was about 4 inches on the ground.
I put 2x6 box in on mine. Cut the rockers out at the bottoms last bend in the door jam area then flush with the pinch weld. Set the box tube in and angled it down a little bit. Then welded 1 inch angle iron on the box tube and to the factory pinch weld. So far so good.
Now I really need to finish the floor on the drivers side.
I stopped cutting at the front and rear of the original rocker and kept it boxed in on the ends. IIRC, it was a shade over 5' of length on each side. Pretty sure I ordered 12' to get it done and had scrap.
We're in the teens without snow. We got about 2" Tuesday, but no more since. With it this cold, I'd prefer the snow.