XJLI
NAXJA Forum User
- Location
- Long Island, NY
got (almost) all of my parts, painting the rims and (hopefully) charging the shocks tomorrow after work. brakes are on the 60.. waggy calipers loaded with impala SS pads. after work friday im pulling the jeep in and whipping out the plasma torch... everything is getting cut out/off.. leafs, control arms, control arm mounts... then the body gets cleaned up and the front and rear stiffys get welded on. with a few guys working on it i'm planning on driving it sunday night... as long as the weather cooperates.