r33pwrd
NAXJA Forum User
- Location
- Sammamish WA USA
You guys crack me up. Maybe I should have said lacking intelligence that way I wouldn't offend your sensativities.
I guess you haven't seen a ton then.
Pretty sure I have more time under my Jeep than most of the people here.
btw mine has frame 3/16 angle welded to the bottom of the frame. Drilled out 3 holes in the proper location and welde 1/2" grade 8 nuts to the top (no tapping of 1/8 steel for a false sense of security for me) Then I also use the t-case bolts so thats 5 per side into substantial metal not thin crap. Also I have small tabs welded so the sheer is not on the bolts either.
![]()
But I guess yours is ok for driving around town to your job and impressing your little friends.
And all this time I thought my welding was bad :looney: