Hoping to get the DD Build close to ready to run this weekend.
Heading home in 30 min. to do a second pressure wash engine bay clean.
Then this weekend I'll get the engine all back together with:
- New Intake/Exhaust Manifold Gasket
- New Exhaust Manifold
- Different PCM :gag:
- Injector O-Rings
- Valve Cover Gasket
- PCV and Breather Valves and New Rubber Rings
- New Waterpump and hose tube
- New Tstat housing and Tstat
- New Radiator Hoses
- New Heater Hoses
- New Belt
- New Air filter
- Upgraded Battery cables
- Upgraded Alternator
- New hatch struts
- Other stuff I'm forgetting
From there, I'll get some fuel in the tank, jump the fuel pump the let it run through some and get the system clean.
Once the exhaust is finished up, she should be ready to run again.
I'll get the interior put back together fully (with some additional sound deadening to do), and she'll drive herself out of the shop.
It'll still need some things like brake lines fixed and flushed. But it won't be too far off being DD ready.
Then, sometime thereafter, the real fun can start
