XJ_Vikings
NAXJA Forum User
- Location
- Simsbury, CT
Not entirely sure yet. The shackle tabs are welded onto the L2x2x1/4" so my moch up can be complete and I can get a better idea of what I want to do. The 1/4 panel guard will come later in the form of 2" DOM tying in from my sliders, over the wheel well and into the bumper. I dont want 2" sticking out from the side of the bumper until im ready to link in the DOM. As I'm writing this, I'm just now thinking I will angle the bumper up as if the 2" is added on, cap it, paint it for the winter and then when I'm ready to add the DOM, (which may be a couple years with this deployment comming up) I will add the 2" sections on the sides.
As far as the shift knobs, I went with both.
I took the spoon off the grenade for now, it clanks around too much. Ill JB weld it later. The rock is infinitely more comfortable then open threads which I've had for the last week or so.
I was having a hard time getting onto 5th gear with the GPS plugged into the power outlet so I installed another one near the steering column with the unused wires from the cigarette lighter.
As far as the shift knobs, I went with both.

I took the spoon off the grenade for now, it clanks around too much. Ill JB weld it later. The rock is infinitely more comfortable then open threads which I've had for the last week or so.
I was having a hard time getting onto 5th gear with the GPS plugged into the power outlet so I installed another one near the steering column with the unused wires from the cigarette lighter.
