Project Geosynchronous Orbit

i dont know what youre building but it looks like the secksiest diving board eva!

Haha thanks I'm just bracing the plate where the ram is mounted.

God, no. But I'll probably drive it around tomorrow a little bit. :)

Nice gap around the cast part, I'm glad we left that clearance space for thermal expansion...wait...what? :dunce:

Coming along nicely. I can't wait to nerf you at Line Mountain. :firedevil

I'm just going to go ahead and call you a dick on all three counts.

:D
 
Coil mount bases done. Tacked the coil plates in to where they should be, might need to change them.

Tomorrow I have a club meeting but might get some time at night to work on it.

IMAG0481.jpg


IMAG0483.jpg


IMAG0484.jpg


IMAG0482.jpg


IMAG0485.jpg
 
Please tell me you are going to mount a crap ton of lights to that front axle bar? That would look wicked sweet, and I bet would get a ton of street cred.

Seriously though Colin, I think you should mount some lights there. I've thought about mounting some in the stock unused TRE holes in my knuckles.
 
dude you gotta remount them buckets, if not yur spings will look like this /\/\/\/\/\/\///\\\/\/\\/\/\/\\/\///\\/\/\//\/\\//\/\/\/\/\/\/ in seriousness all looks awsome
 
Please tell me you are going to mount a crap ton of lights to that front axle bar? That would look wicked sweet, and I bet would get a ton of street cred.

Seriously though Colin, I think you should mount some lights there. I've thought about mounting some in the stock unused TRE holes in my knuckles.

If I mounted lights there, they'd be gone before I get through one trail.

dude you gotta remount them buckets, if not yur spings will look like this /\/\/\/\/\/\///\\\/\/\\/\/\/\\/\///\\/\/\//\/\\//\/\/\/\/\/\/ in seriousness all looks awsome

Hahaha thanks Rob

take good notes, Mr Secretary

I suck at my position.
 
Got the frameside tabs tacked into place. Will get the axleside ones tacked in tomorrow.

4" drop from the rail, and will be 4" raised off the tube truss.

Hopefully the pics are clearer :gee:

IMAG0492.jpg


IMAG0497.jpg


IMAG0498.jpg
 
SQUARE BUSHING!!!!!!! WHAAAAAAAT!!!!
 
Got the axleside trackbar mount tacked in place and tacked a trackbar together. Adjusted the frameside a bit as well.

This is at full bump. 32" from bolt hole to bolt hole. 7/8" x 5/8" heims.

IMAG0501.jpg


IMAG0504.jpg


IMAG0503.jpg


Tomorrow I'm going to box the mounts and burn them in as well as the trackbar itself. Then ill box in the UCA mount and build the UCA as well.
 
That's pretty nice. I like the axle pan hard mount. I am not going full hydraulic, but I might have to copy you anyways. Whats the OD and wall thickness on the tubing you used? Sure it was already covered but I am lazy.

It's just 1.75 x .120 DOM. If I was to do it again is run some 2 x .120 cut in half over the front and top to help with dents and so the trackbar bracket has 0 chance of tearing.

I added the other tube and gusset to hopefully prevent that.
 
Back
Top