Hi guys. I have a 92 XJ with the NP231 xfer case. I need to replace my front u-joints. I was having some work done (in a time pinch, or it would have been DIY, of course) at a local service shop. I mentioned the u joints, and he call s me back and says that there is no way he can do it. Says that with that type of drive shaft (the old double cardan) he would have to have his driveshaft repair partner do it. I said price it, since you already have it there. He calls back and says "somewhere between $480 and $520! I said don't touch it.
What's the deal? I was always under the assumption I could do it, given the time. Is there a write up out there? I plan to just pull it and drive it in rear wheel drive until I figure it out. I am thinking more like $60 for the ujoints (3 total) and some sweat and tears. How hard is it?
\
Thanks, both for the replies that are coming and for letting me vent a little. Lance
What's the deal? I was always under the assumption I could do it, given the time. Is there a write up out there? I plan to just pull it and drive it in rear wheel drive until I figure it out. I am thinking more like $60 for the ujoints (3 total) and some sweat and tears. How hard is it?
\
Thanks, both for the replies that are coming and for letting me vent a little. Lance