Fordyce Work day

I'm going up on the 18th to meet with Mary Furney and Joe Cavez(Forest Service.) If a workable bypass can be figured out we will mobilize and hit it on the 21st. We're going to need chainsaws, come-a-longs, and a lot of muscle. As Keith said, no wheelers with the possible exception of one rig to carry the tools, is the plan to limit trail damage due to all the snow and runoff. THe work area is only about 1.5 to 2 miles in so it's an easy hike. I'll post up on the evening of the 18th so stay tuned.

I'll still be in Michigan, or I would.
 