Accomplished today:
1) Finish install and working ness of my ForMatt CO2 tank. Finally got the 1/4" fitting out of the gauges that come with it.(Matt: socket on a 2.5ft cheater bar worked like a charm)
2) Now that I have OBA and CO2 I pulled the stem on my BFG 35" and stuffed it in laying down in the back end...whoohooo
3) installed a Hidden Hitch, what a bitch with the Tomken Skid already there
4)
Organized my new tool box(s). I found these things at the army supply shop. I assume you can get them at any hunting supply, They are call "Dry Boxes". Used for shotgun ammo and such. Fit behind the front seat very nicely
5) Towed the camper to the house using the XJ. Boy, my top speed is going to be about 55mph.
6) Finally wired up my ForMatt taill lights and LEDs CORRECTLY. This project took the longest because I did it 1/2 ass the first time and had to spend a lot of time today figuring out what wire did what. That project worked right along with wiring up the trailer lights...
Tomorrow:
1) get the camper packed
2) install the OBA quick connect under hood
3) tight up crappy axle end track bar set up
4) put new pad on the rear of my Honda Accord
5) catch the end of the International, got Sunday tickets!