I'm hoping to do the rubicon Sept 12-14 if I can figure out the popping sounds in my axle (see OEM forum) then on Sept 15-16 we're gonna try and get through Fordyce. anyone know how high the river is running. Are they passable?
Have any of you been able to get through the trail in a day or does it really take two full days. We'll be going through with 2 really well built rigs on a Monday so there shouldn't be much traffic, if any at all.