philip_g
NAXJA Forum User
- Location
- back in CO
I was planning to install about 800 sq ft of laminate flooring in my house, I had the underlayment and the floor, had been in and acclimated so off we went cutting up the carpet and ripping out the pad, the tack strips and transitions were nailed into the concrete so those were fun too.
get to laying the flooring, the damn flooring didn't fit together worth a damn, and kept chipping on the corners so I ripped it up, reboxed what hadn't been cut and returned 29 boxes of floor planks to lowes
now I have no carpet and bare concrete floors and it'll be 3-4 weeks before I can try again with a better product.
Hey so how'd the project raffle rig work day go? I should have been there instead of doing this crap.
oh and the jeep is halarious with ~1500 pounds of flooring in the back.
get to laying the flooring, the damn flooring didn't fit together worth a damn, and kept chipping on the corners so I ripped it up, reboxed what hadn't been cut and returned 29 boxes of floor planks to lowes

now I have no carpet and bare concrete floors and it'll be 3-4 weeks before I can try again with a better product.
Hey so how'd the project raffle rig work day go? I should have been there instead of doing this crap.
oh and the jeep is halarious with ~1500 pounds of flooring in the back.