- Location
- Thornton, CO
Got the housing back today. Need to find the time now to get the gears installed. Maybe if I'm lucky I'll have this thing rebuilt before the 1 year anniversary of the breakage..............



tonesxj said:Better get that arb in quick.. Before I snag it!:eyes:
tonesxj said:05 LJ.. Dare I say on this board. I'll get you some pics.
Caged94XJ said:Everytime I go over to Troy's he has to trip over that dam thing to get me parts...
Caged94XJ said:It's about time... Geez DJ you have been messing around with that thing for long enough. Everytime I go over to Troy's he has to trip over that dam thing to get me parts... Good to see you might get it done... Haven't you been down since I towed your rig in to CO last year???
91 Jeep Project said:Sand Blasted and Powder Coated, 'bout a week.
jdogg4 said:how much did that run ya. I'll be bringin in mine here to the shop to sandblast it but I'm not going the PC direction. We use some HD epoxy's here at the shop with big time UV ratings and I'm going to have the guys hit it with that stuff. Same as my bumpers and rockers.
planefixer said:You mean like your axle(s) I was tripping over in Coop's shop (that have been there forever)? Fawking hypocrite.:roflmao:
planefixer said:You mean like your axle(s) I was tripping over in Coop's shop (that have been there forever)? Fawking hypocrite.:roflmao: