Explorer 1
NAXJA Forum User
- Location
- Whittier, Ca
With the modified header/exhaust system I made to clear the 9" Currie high pinion front axle, I'm facing a problem of the fuel lines over heating the gas and causing a vapor lock and as an additional issue, pre-detonation (once the fuel has really warmed up) due to the extra heat/ possible leaness of the over heated fuel.
Has any out there re-route their fuel lines over to the other side of the uni-body frame rail (or through the frame rail) and then back across the rear axle to the fuel tank?
Thanks,
Fred
Explorer 1
Has any out there re-route their fuel lines over to the other side of the uni-body frame rail (or through the frame rail) and then back across the rear axle to the fuel tank?
Thanks,
Fred
Explorer 1