Jonner
NAXJA Forum User
- Location
- Charlotte, NC
Like the title says, I'm working on pulling the motor out of the Jeep for a rebuild, and should be pulling the engine out in the next few week with the trans and TC attached. I'm using a 1 ton engine hoist from harbor fright with a 3/4 ton heavy duty load leveler.
I've detached nearly everything on the engine, trans, and TC. I've got the load leveler connected to an exhaust manifold bolt in the back and the AC bracket on the front. I'd have to fab up some hardware to fit all 4 mounts of the load leveler on the engine, so only 2 are attached.
1) Am I okay with clearances pulling these out as one unit? And, am I okay with the capacity of the hoist? The TC+TRANS+ENGINE is a heavy beast
2) Are my attachment points OK or I am putting too much force on those holes?
3) Anything I'm missing here that I should consider? The transmission dipstick tube looks to be in the way. And the transfer case linkage is being a PITA. On the TC linkage I still need to get the piece that mounts passenger-side to driver-side and connects the two longer rods loose.
Thanks,
Jonathan
I've detached nearly everything on the engine, trans, and TC. I've got the load leveler connected to an exhaust manifold bolt in the back and the AC bracket on the front. I'd have to fab up some hardware to fit all 4 mounts of the load leveler on the engine, so only 2 are attached.
1) Am I okay with clearances pulling these out as one unit? And, am I okay with the capacity of the hoist? The TC+TRANS+ENGINE is a heavy beast
2) Are my attachment points OK or I am putting too much force on those holes?
3) Anything I'm missing here that I should consider? The transmission dipstick tube looks to be in the way. And the transfer case linkage is being a PITA. On the TC linkage I still need to get the piece that mounts passenger-side to driver-side and connects the two longer rods loose.
Thanks,
Jonathan