Measure between pin 3 (orange wire) at the TPS and ground to see if you have 5 VDC. If you do, then the ground return is bad. Both 5 VDC and the ground come from the PCM. Both of the wires have at least one splice between them and the PCM. You can check the voltage at the PCM too. Connector...