• Welcome to the new NAXJA Forum! If your password does not work, please use "Forgot your password?" link on the log-in page. Please feel free to reach out to [email protected] if we can provide any assistance.

NAXJA 15th Annual Fall Fling Trail Run info

XJEEPER

NAXJA Member # 13
NAXJA Member
Location
Wasatch Range
Alright folks, attached you will find the Trail Run Schedule for the NAXJA 15th Annual Fall Fling. Links are included for Trail Ratings and Trail Descriptions, courtesy of Red Rock 4 Wheelers, Inc.


We will need volunteers Trail Leaders for the scheduled runs. Please PM me with the trail run you would like to lead, include legal name, cell phone, trail and date.

A qualified Tailgunner will be selected from each group by the Trail Leader, on the morning of the run.

Required daily per rig BLM Trail fees will most likely be included in the Registration Fees, however there will be additional $10 per rig Natl Park Gate fee associated with Shafer Trail and Elephant Hill runs and a $5 per rig Sand Flats Rec Area gate fee for access to Hell's Revenge.

A map of Moab with Trail Staging areas is being compiled and will be available electronically, prior to the event, as well as being posted at the event.

Trail Description [B]http://www.rr4w.com/trails.cfm[/B]

Trail Rating Guide [B]http://www.rr4w.com/ratings.cfm[/B]

party1:
 

Attachments

  • 15th Annual Fall Fling Trail Runs 2014 Draft 2.pdf
    25.9 KB · Views: 104
Last edited:
Update Trail Run list with Leaders who have committed as of 10-1-14
 

Attachments

  • 15th Annual Fall Fling Trail Runs 2014.pdf
    24.4 KB · Views: 53
Back
Top