• NAXJA is having its 18th annual March Membership Drive!!!
    Everyone who joins or renews during March will be entered into a drawing!
    More Information - Join/Renew
  • Welcome to the new NAXJA Forum! If your password does not work, please use "Forgot your password?" link on the log-in page. Please feel free to reach out to [email protected] if we can provide any assistance.

To-Do List

MoparManiac

NAXJA Forum User
Location
Amherst, NH
Yup, I'm starting it this year.

- Build front truss for steering ram
- Finish front suspension mounts (shock, coil, box in link mounts)
- Build track bar and brackets
- Order/Build control arms
- Put rear suspension together (weld in perches, shackle hangers)
- Build rear bumper
- Finish bobbing the bed
- Build rear wheel wells
- Gear, assemble, paint both axles
- Prep new leaf spring packs
- Figure out brake system (hydroboost) and associated plumbing
- Fuel cell and associated plumbing (RCI and YJ unit)
- Build rockers
- Put interior back together and run the wiring harness
- Modify bracket for slave cylinder
- Build exhaust
- Cage if time permits

Probably still plenty I left off that list.
 
finish mounts on both axles(not much left just lots o gusseting)
brakes
translines
seals on motor and trans
motor and trans mounts
traction bar
shocks
gear and lock axles
driveshafts
tcase skid
rockers
bumpers
cage
steering
floors
frame plating
seat mounts
aquire truck and trailer
 
I have a bunch of stuff I want to do. Mainly, make sure my ass gets to PA this year :D
 
Find rust free Jeep and swap lift, bumpers and sliders over.
Swap in 8.8
Regear D30
Install SYE
Buy 33's
 
Spare parts....replace broken stuff....pack Jeep....maybe buy a spare 35....
 
So far the list goes as

Priority:
-SYE
-Rear locker
-Steering box brace
-Tranny cooler
-Upper Control arms
-Spares

Not Priority:
-Roof Rack
-Trail Doors--- If anyone has some 97+ front doors Ill take em
-Bumper hoop
 
Frame stiffeners
Shackle Relocation boxes
New unit bearings
Rear disc brakes

Think that's about it. All of it but the unit bearings I can go without but I want to do it. Just gotta hope it dont break down right before.
 
I have a 231 with a sye as well if anyone is looking for one

To do-
Build axles and get them in
install quarter guards
Trans cooler
Figure out mystery cold soak no start issue

Want to do
D300
 
As of right now...driver side motor mount bushing, passenger front bumpstop & possible shock rebuild, overflow & drain line for the coolant bottle.

Maybe figure out something for the CCV so it doesn't blow oil out the dipstick tube at sustained high RPM's.

Sure this list will grow in 5 months though...got two races to get through first. :laugh:
 
shackle relocation brackets
motor mounts
figure out why my winch doesn't work


build 44 by then?
 
hmmm...

TODO:
try to avoid breaking my junk badly enough that I can't fix it
rear bumpstops
put new control arms in instead of just carrying them as spares
replace a few ujoints
fix transfer case shift linkage
finish welding in floors one of these years
finish fixing M54A2 and get it registered etc

what's going to get done off that list?:
hopefully the first two and the last one, the rest will probably be ignored
 
in order.. kinda..

weld on stiffys.
weld in rocker replacement box tube stuff.
cage.
some sort of SYE for my 231 or get a 241
buy a selectable for the front 44..
buy... the entire suspension. and install it.
swap the axles under it.
get wheels and tires.
profit.


short list.
 
haha my list is very small as I am realistic.

1) Have 4 sort of matching tires.
2) Front locker if I get lucky at tax time.
3) non saggy headliner

thats all.
 
Back
Top